Page 5 of 8
Discharge the Proposed Catchments to the Pond Endwall
The Post-Development catchments are currently discharging to the Site-Outfall. We need to move the discharge to the Pond-Endwall.
This can be done via the Catchment FlexTable or graphically:
- Click on a Catchment to show a line from its centroid to it Outflow Structure
- Hover over the Outflow structure end to show the ReassignOutflow message.
- Click the “handle” over the Outflow.
- Then click on the new Outflow.
|
|
|
A Catchment FlexTable can show the all the Catchments and their Outflow Elements at once.
The Outflow Element can be changed in the FlexTable